Supervision for construction as the key activity in consulting services requires a very elaborated systematic approach.
Supervision Division of Yekom Consulting Engineers as one of the core divisions is responsible for implementation planning as well as supervision for construction of different projects. Due to number, variation and sporadic characters of supervision projects, this division has divided into three sections geographically to optimize the quality of its services. In the recent years, this division has been involved in about 30 projects at a time.
To perform its responsibilities and functions, this division benefits from services of Coordination Secretary as well as management of head of different supervision sections and selected project managers.
The main responsibilities and functions of this division are:
1. At Tender Stage
Cooperates with other divisions for quantity estimation and preparation of tender documents
Prepares the pre-evaluation documents and proceeds the evaluation stages for selection of qualified contractors to be called for tender
Collaborates with clients in selection of the contractors
Prepares the agreement documents for the selected contractors
2. Planning, Implementation Procedures and Progress Control
Review and comment on general timetable prepared by the consultant in the detail design and implementation stages
Review and comment on the technology and implementation procedures recommended in the detail design
Pursue the project control and planning system, established by contractors and equipment suppliers and supervise its implementation
Review and approve the detailed timetable including manpower, machinery and materials
Prepare the monthly progress report, compare the actual progress with the recommended timetable, analyze the delays, if any and submit the appropriate solutions
3. Techno-Engineering Services
 Revise the design and shop drawings during implementation, if required
Prepare forms, guidelines and documents for different stages of quality control, work inspection, tests, work completion and required work orders
Prepare the detailed list of required tests
Maintain the technical documents and quality control records
Prepare lists of required resources for project implementation including manpower, materials, machineries and tools
Revise the drawings and technical specifications during construction stage, if required and prepare the complementary and detailed shop drawings
Control and approve the shop and as-built drawings
4. Quality Control Services
Inspect the performed activities and compare with drawings, technical specifications, standards and work orders continually
Check if the actual implemented axes and levels agree with the drawings
Supervise storage and maintenance of materials and equipment on site
Require the needed tests to be performed and supervise the performance
Give notice the possible deficiencies, shortcomings and faults
5. Estimation, Quantity Control, Payments and Legal Issues of Contracts, Work Delivery
Review and update the estimations and prepare the new bill of quantities during construction phase
Measure the accomplished tasks and materials on site, control and approval of temporary and final statements
Check the contractors delays according to the contract
Review the legal issues of the contract, comment on contractors claims, and cooperate with the client in settlement of any disputes
Review and comment on installments, new prices, redemption of guarantees, etc.
Temporary and final delivery of services
Major Completed&Ongoing Projects
|
Major Completed Projects of Supervision
Division
Water Engineering, Dam, River Engineering |
|
No |
Project Title |
Client |
Location/ Province |
Completion Date |
|
1 |
Sarghanat Diversion Dam- Construction
Supervision |
Fars, Bushehr, Kohkilouyeh Boirahmad
Regional Water Corporation |
Bushehr |
1985 |
|
2 |
Churum Diversion Dam- Construction
Supervision |
Fars, Bushehr, Kohkilouyeh Boirahmad
Regional Water Corporation |
Bushehr |
1992 |
|
3 |
Rouzbehan Diversion Dam- Construction
Supervision |
Fars, Bushehr, Kohkilouyeh Boirahmad
Regional Water Corporation |
Fars |
1995 |
|
4 |
Rais Ali Delvari Storage Dam Access Road-
Construction Supervision |
Fars, Bushehr, Kohkilouyeh Boirahmad
Regional Water Corporation |
Bushehr |
1999 |
|
5 |
Rais Ali Delvari Storage Dam Diversion
Tunnel- Construction Supervision |
Fars, Bushehr, Kohkilouyeh Boirahmad
Regional Water Corporation |
Bushehr |
1998 |
|
6 |
Jegin Dam Water Conveyance Canal
and Diversion Installations- Construction
Supervision |
Hormozgan Regional Water Corporation |
Hormozgan |
2007 |
|
7 |
Aras River
Training in Maghsoudlou Reach- Construction
Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
2000 |
|
8 |
Aras River
Training in Tazehkand Reach- Construction
Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
2002 |
|
9 |
Aras River
Training in Davoodan Reach- Construction
Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
2002 |
|
10 |
Aras River
Training in Ozontappeh- Ghoorchai Reach-
Construction Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
2002 |
|
11 |
Aras River
Training in Qareh Daghlou Reach-
Construction Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
2002 |
|
12 |
Alesh-rud Riverbank Stabilization-
Construction Supervision |
Central Bank of Iran |
Mazandaran |
2002 |
|
Major Completed Projects of Supervision
Division
Water Pump Stations |
|
No |
Project Title |
Client |
Location/ Province |
Completion Date |
|
1 |
Moghan Plain Pumping Plant No 8 (to supply
water for 3500 ha of Bilehsavar lands)-
Construction Supervision |
Ardebil Regional Water Corporation |
Ardebil |
2001 |
|
2 |
Moghan Plain Pumping Plant No 4 (to supply
water for 2500 ha of lands)- Construction
Supervision |
Pars Agro-Industry & Animal Husbandry
Company |
Ardebil |
2001 |
|
3 |
Legzi Pumping Plant and Water Transmission
Pipeline- Construction Supervision |
Jihad Agriculture Organization of Kurdistan
Province |
Kurdistan |
2003 |
|
4 |
Alghana Pumping Plants and Water Transmission Line-
Construction Supervision |
East Azarbaijan Regional Water Corporation |
Ardebil |
2005 |
|
5 |
Yengikand Pumping Plant- Construction
Supervision |
Zanjan Regional Water Corporation |
Zanjan |
2003 |
|
6 |
Moghan Plain Pumping Plant No 5 (with 2.2m3/s
discharge capacity)- Construction
Supervision |
Pars Agro-Industry & Animal Husbandry
Company |
Ardebil |
2002 |
|
7 |
Shahid Maleki (Bayouz) Pumping Plant (1.2m3/s
discharge capacity) and Water Transmission
Pipeline (2.2km long)- Construction
Supervision |
Iran Fishery Company |
Khuzistan |
1996 |
|
8 |
Pars I Pumping Plant of Moghan Irrigation
Network - Construction Supervision |
Pars Agro-Industry & Animal Husbandry
Company |
Ardebil |
2002 |
|
9 |
Khuzistan Sugarcane Development Project,
Amir Kabir Pumping Plant (with 36m3/s
discharge capacity)- Construction
Supervision |
Sugarcane Development & Byproducts Company |
Khuzistan |
1996 |
|
10 |
Khuzistan Sugarcane Development Project,
Mirza Kuchak Khan Pumping Plant (with 36m3/s
discharge capacity)- Construction
Supervision |
Sugarcane Development & Byproducts Company |
Khuzistan |
1997 |
|
11 |
Khuzistan Sugarcane Development Project,
Amir Kabir and Mirza Kuchak Khan Secondary
Pumping Plants (60 Units)- Construction
Supervision |
Sugarcane Development & Byproducts Company |
Khuzistan |
1997 |
|
12 |
Sarab Changaie Pumping Plant- Construction
Supervision |
Ministry of Jihad Agriculture,
Lorestan Industrial Meet Complex |
Lorestan |
1986 |
|
Major Completed Projects of Supervision
Division
Irrigation and Drainage |
|
No |
Project Title |
Client |
Location/ Province |
Completion Date |
|
1 |
Complementary and Improvement Works of Moghan Plain Main
Irrigation and Drainage Network, Lots 1 and
2- Construction Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
1990 |
|
2 |
Complementary and Improvement Works of Moghan Plain Border
Drainage and Related Drainage Systems-
Construction Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
1995 |
|
3 |
Moghan Plain Main Canal's Watering Place-
Construction Supervision (40 Units) |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
1995 |
|
4 |
Moghan Plain Main, D3L & D1L Canal Lining- Construction
Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
1999 |
|
5 |
Complementary and Improvement Works of Moghan Plain
Irrigation and Drainage Network, Lot 4-
Construction Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
1994 |
|
6 |
Moghan Plain D10L Canal Dredging and Lining- Construction
Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
1995 |
|
7 |
Moghan Plain Main Canal Lining Pilot Plan, Using Incomat
Double-casing Polyamide Synthetics (840m
long)-Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
1999 |
|
8 |
Complementary and Improvement Works of Moghan Plain
Irrigation and Drainage Network, Lot 6-
Construction Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
1998 |
|
9 |
Complementary and Improvement Works of Moghan Plain
Irrigation and Drainage Network, Lot 7-
Construction Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
1999 |
|
10 |
Complementary and Improvement Works of Moghan Plain
Irrigation and Drainage Network, Lot 5B
(1848 ha)- Construction Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
Ardebil |
2003 |
|
11 |
Complementary Works of Moghan Plain Irrigation and
Drainage Network, Lots 6 & 7- Construction
Supervision |
East Azarbaijan and Ardebil Regional Water
Corporation |
| |