Supervision Division

Supervision for construction as the key activity in consulting services requires a very elaborated systematic approach. Supervision Division of Yekom Consulting Engineers as one of the core divisions is responsible for implementation planning as well as supervision for construction of different projects. Due to number, variation and sporadic characters of supervision projects, this division has divided into three sections geographically to optimize the quality of its services. In the recent years, this division has been involved in about 30 projects at a time.
To perform its responsibilities and functions, this division benefits from services of Coordination Secretary as well as management of head of different supervision sections and selected project managers.

The main responsibilities and functions of this division are:
1. At Tender Stage
• Cooperates with other divisions for quantity estimation and preparation of tender documents
• Prepares the pre-evaluation documents and proceeds the evaluation stages for selection of qualified contractors to be called for tender
• Collaborates with clients in selection of the contractors
• Prepares the agreement documents for the selected contractors
2. Planning, Implementation Procedures and Progress Control
• Review and comment on general timetable prepared by the consultant in the detail design and implementation stages
• Review and comment on the technology and implementation procedures recommended in the detail design
• Pursue the project control and planning system, established by contractors and equipment suppliers and supervise its implementation
• Review and approve the detailed timetable including manpower, machinery and materials
• Prepare the monthly progress report, compare the actual progress with the recommended timetable, analyze the delays, if any and submit the appropriate solutions
3. Techno-Engineering Services
• Revise the design and shop drawings during implementation, if required
• Prepare forms, guidelines and documents for different stages of quality control, work inspection, tests, work completion and required work orders
• Prepare the detailed list of required tests
• Maintain the technical documents and quality control records
• Prepare lists of required resources for project implementation including manpower, materials, machineries and tools
• Revise the drawings and technical specifications during construction stage, if required and prepare the complementary and detailed shop drawings
• Control and approve the shop and as-built drawings
4. Quality Control Services
• Inspect the performed activities and compare with drawings, technical specifications, standards and work orders continually
• Check if the actual implemented axes and levels agree with the drawings
• Supervise storage and maintenance of materials and equipment on site
• Require the needed tests to be performed and supervise the performance
• Give notice the possible deficiencies, shortcomings and faults
5. Estimation, Quantity Control, Payments and Legal Issues of Contracts, Work Delivery
• Review and update the estimations and prepare the new bill of quantities during construction phase
• Measure the accomplished tasks and materials on site, control and approval of temporary and final statements
• Check the contractors delays according to the contract
• Review the legal issues of the contract, comment on contractors claims, and cooperate with the client in settlement of any disputes
• Review and comment on installments, new prices, redemption of guarantees, etc.
• Temporary and final delivery of services



Major Completed&Ongoing Projects

 Major Completed Projects of Supervision Division

Water Engineering, Dam, River Engineering

No

Project Title

Client

Location/ Province

Completion Date

1

Sarghanat Diversion Dam- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

1985

2

Churum Diversion Dam- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

1992

3

Rouzbehan Diversion Dam- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Fars

1995

4

Rais Ali Delvari Storage Dam Access Road- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

1999

5

Rais Ali Delvari Storage Dam Diversion Tunnel- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

1998

6

Jegin Dam Water Conveyance Canal and Diversion Installations- Construction Supervision

Hormozgan Regional Water Corporation

Hormozgan

2007

7

Aras River Training in Maghsoudlou Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2000

8

Aras River Training in Tazehkand Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

9

Aras River Training in Davoodan Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

10

Aras River Training in Ozontappeh- Ghoorchai Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

11

Aras River Training in Qareh Daghlou Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

12

Alesh-rud Riverbank Stabilization- Construction Supervision

Central Bank of Iran

Mazandaran

2002

 

 

Major Completed Projects of Supervision Division

Water Pump Stations

No

Project Title

Client

Location/ Province

Completion Date

1

Moghan Plain Pumping Plant No 8 (to supply water for 3500 ha of Bilehsavar lands)- Construction Supervision

Ardebil Regional Water Corporation

Ardebil

2001

2

Moghan Plain Pumping Plant No 4 (to supply water for 2500 ha of lands)- Construction Supervision

Pars Agro-Industry & Animal Husbandry Company

Ardebil

2001

3

Legzi Pumping Plant and Water Transmission Pipeline- Construction Supervision

Jihad Agriculture Organization of Kurdistan Province

Kurdistan

2003

4

Alghana Pumping Plants and Water Transmission Line- Construction Supervision

East Azarbaijan Regional Water Corporation

Ardebil

2005

5

Yengikand Pumping Plant- Construction Supervision

Zanjan Regional Water Corporation

Zanjan

2003

6

Moghan Plain Pumping Plant No 5 (with 2.2m3/s discharge capacity)- Construction Supervision

Pars Agro-Industry & Animal Husbandry Company

Ardebil

2002

7

Shahid Maleki (Bayouz) Pumping Plant (1.2m3/s discharge capacity) and Water Transmission Pipeline (2.2km long)- Construction Supervision

Iran Fishery Company

Khuzistan

1996

8

Pars I Pumping Plant of Moghan Irrigation Network - Construction Supervision

Pars Agro-Industry & Animal Husbandry Company

Ardebil

2002

9

Khuzistan Sugarcane Development Project, Amir Kabir Pumping Plant (with 36m3/s discharge capacity)- Construction Supervision

Sugarcane Development & Byproducts Company

Khuzistan

1996

10

Khuzistan Sugarcane Development Project, Mirza Kuchak Khan Pumping Plant (with 36m3/s discharge capacity)- Construction Supervision

Sugarcane Development & Byproducts Company

Khuzistan

1997

11

Khuzistan Sugarcane Development Project, Amir Kabir and Mirza Kuchak Khan Secondary Pumping Plants (60 Units)- Construction Supervision

Sugarcane Development & Byproducts Company

Khuzistan

1997

12

Sarab Changaie Pumping Plant- Construction Supervision

Ministry of Jihad Agriculture,

Lorestan Industrial Meet Complex

Lorestan

1986

 

 

Major Completed Projects of Supervision Division

Irrigation and Drainage

No

Project Title

Client

Location/ Province

Completion Date

1

Complementary and Improvement Works of Moghan Plain Main Irrigation and Drainage Network, Lots 1 and 2- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1990

2

Complementary and Improvement Works of Moghan Plain Border Drainage and Related Drainage Systems- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1995

3

Moghan Plain Main Canal's Watering Place- Construction Supervision (40 Units)

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1995

4

Moghan Plain Main, D3L & D1L Canal Lining- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1999

5

Complementary and Improvement Works of Moghan Plain Irrigation and Drainage Network, Lot 4- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1994

6

Moghan Plain D10L Canal Dredging and Lining- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1995

7

Moghan Plain Main Canal Lining Pilot Plan, Using Incomat Double-casing Polyamide Synthetics (840m long)-Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1999

8

Complementary and Improvement Works of Moghan Plain Irrigation and Drainage Network, Lot 6- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1998

9

Complementary and Improvement Works of Moghan Plain Irrigation and Drainage Network, Lot 7- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1999

10

 

Complementary and Improvement Works of Moghan Plain Irrigation and Drainage Network, Lot 5B (1848 ha)- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2003

11

Complementary Works of Moghan Plain Irrigation and Drainage Network, Lots 6 & 7- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

12

Shahid Ghaffari Lake Dredging and Sediment Extraction, Moghan Plain Irrigation Network, Lot 11- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

13

Moghan Plain Irrigation Network Improvement, Lot MC-I/1- Construction Supervision of 800 ha Canalization

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1999

14

Moghan Plain Irrigation Network Improvement, Lot MC-I/2- Construction Supervision of13500 ha Canalization

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1999

15

Moghan Plain Irrigation Network Improvement, Lot MC-I/3- Construction Supervision of 6400 ha Canalization

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1999

16

Moghan Plain Irrigation Network Improvement, Lot MC-I/4- Supervision on Canal A Lining

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2000

17

Moghan Plain Irrigation Network Improvement, Lot MC-I/4A- Construction Supervision

Irrigation Network Development Department

Ardebil

2001

18

Moghan Plain Irrigation Network Improvement, Lot MC-I/5A- Production Supervision of Semielliptical Semi-pipe Canalet and Appurtenants

Irrigation Network Development Department

Ardebil

2001

19

Moghan Plain Irrigation Network Improvement, Lot MC-I/5B including Semielliptical Semi-pipe Canalet (85km) and Appurtenants (7200 ha)

Irrigation Network Development Department

Ardebil

2001

20

Moghan Plain Irrigation Network Improvement, Lot MC-I/5A Transportation and Installation Supervision of Semielliptical Semi-pipe Canalet (180km, 8750 ha)

East Azarbaijan Regional Water Corporation

Ardebil

2001

21

Moghan Plain Irrigation Improvement Project, Lots MC-I/10, 11- Construction Supervision of Subsurface Drainage System (4200 ha)

On Farm Development Department

Ardebil

2001

22

Moghan Plain Irrigation Improvement Project, Lot MC-I/12- Construction Supervision of Subsurface Drainage System

 

Ardebil Regional Water Corporation

Ardebil

2001

23

Moghan Plain Irrigation Network, Pumping Plant No. 8 (3500 ha)- Construction Supervision

Ardebil Regional Water Corporation

Ardebil

2007

24

Moghan Plain Irrigation Network and Water Regulation Basin- Construction Supervision

Pars Agro-Industry and Animal Husbandry Company

Ardebil

2002

25

Moghan Plain Irrigation and Drainage Network, Lot 3, Tertiary Canals (3200 ha)- Construction Supervision

Irrigation Network Development Department

Ardebil

1989

26

Moghan Plain Irrigation Network, Emergency Subsurface Drainage System  (400 ha)- Construction Supervision

On Farm Development Department

Ardebil

1989

27

Khesht Plain Irrigation and Drainage Network, Lot 1-Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehrs

1997

28

Dalaki Plain Subsurface Drainage Network (2000 ha)- Construction Supervision

Ministry of Jihad Agriculture, Irrigation Network Development Department

Bushehr

2005

29

Jegin Dam Main Irrigation and Drainage Network (4500 ha)- Construction Supervision

Hormozgan Regional Water Corporation

Hormozgan

2005

30

Shamil Diversion Dam and Irrigation and Drainage Network- Construction Supervision

Hormozgan Regional Water Corporation

Hormozgan

2004

31

Sabili Dez Lateral Irrigation and Drainage Networks- Construction Supervision

Agricultural Services Development Organization

Khuzistan

2000

32

Ocaliptus Irrigation and Drainage Network and On-farm Development- Construction Supervision

Khoramshahr Reconstruction Center

Khuzistan

2002

33

Yengi Kand Irrigation and Drainage Network (25000 ha)- Construction Supervision

Zanjan Regional Water Corporation

Zanjan

2003

34

Khuzistan Sugarcane Development Project, Amir Kabir Irrigation and Drainage Network (12000 ha)- Construction Supervision

Sugarcane Development & Byproducts Company

Khuzistan

2003

35

Khuzistan Sugarcane Development Project, Mirza Kuchak Khan Irrigation and Drainage Network (12000 ha)- Construction Supervision

Sugarcane Development & Byproducts Company

Khuzistan

2003

 

 

Ongoing Projects of Supervision Division

No

Project Title

Client

Location/ Province

Starting Date

1

Idoghmush Irrigation and Drainage Network, Lots I, II and III, Water Transmission Canals including Flume and Tunnel- Construction Supervision

East Azarbaijan Regional Water Corporation

East Azarbaijan

2003

2

Aras Border River Training in Davoodan Tappeh, Ghoorichai, Qareh Daghlou, Tazeh Kand, Noordouz and Sharafeh Reaches- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

East Azarbaijan and Ardebil

2001

3

Moghan Plain Lateral Irrigation Networks, Lots 7 and 8- Construction Supervision

Ministry of Jihad Agriculture,

Irrigation Networks Development Department

Ardebil

2004

4

Tabriz Plain Development Area 4, Ajichai- Construction Supervision

East Azarbaijan Regional Water Corporation

East Azarbaijan

2003

5

Minoo Island Main Water Canal, Khorramshahr Development Unit 3- Construction Supervision

Khuzistan Water and Power Authority

Khuzistan

2004

6

Shahr Bijar Storage Dam- Construction Supervision

Guilan Regional Water Corporation

Guilan

2004

7

Idoghmush Pressurized Irrigation Networks, Akramabad Unit- Construction Supervision

Jihad Agriculture Organization of East Azarbaijan Province

East Azarbaijan

2004

8

Jegin Plain Lateral Irrigation and Drainage Network- Construction Supervision

Jihad Agriculture Organization of Hormozgan Province,

 Zamin Bank

Hormozgan

2005

9

Tabriz Plain AMC Canal's Diversion Dam, Irrigation & Drainage Network- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

East Azarbaijan

2004

10

Shabankareh Plain Main Irrigation and Drainage Network- Construction Supervision

Bushehr Regional Water Corporation

Bushehr

2003

11

Shabankareh Plain Diversion Dam, Tunnel and Water Conveyance System - Construction Supervision

Bushehr Regional Water Corporation

Bushehr

2006

12

Tabriz Plain Main Irrigation and Darainage Network, Development Area 4- Construction Supervision

East Azarbaijan and Ardebil Regional Water Authority

East Azarbaijan

2003

13

Idoghmush Irrigation and Drainage Network, Lot I Water Supply (2550 ha: 4 Pumping Plants)- Construction Supervision

East Azarbaijan Regional Water Corporation

East Azarbaijan

2005

14

Sarghanat, Bibara and Helleh Irrigation Canals, Dalaki Plain- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

2004

15

Shabankareh Plain Irrigation and Drainage Network (11000 ha)- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

2003

16

Idoghmush Lot III Transmission Line (15 km)- Construction Supervision

East Azarbaijan Regional Water Corporation

East Azarbaijan

2006

17

Moghan Plain Main and A Canals Leaked Areas Lining Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2007

 

 

Supervision Division Organization Chart

 