Supervision for construction as the key activity in consulting services requires a very elaborated systematic approach. Supervision Division of Yekom Consulting Engineers as one of the core divisions is responsible for implementation planning as well as supervision for construction of different projects. Due to number, variation and sporadic characters of supervision projects, this division has divided into three sections geographically to optimize the quality of its services. In the recent years, this division has been involved in about 30 projects at a time.
To perform its responsibilities and functions, this division benefits from services of Coordination Secretary as well as management of head of different supervision sections and selected project managers.

The main responsibilities and functions of this division are:
1. At Tender Stage
• Cooperates with other divisions for quantity estimation and preparation of tender documents
• Prepares the pre-evaluation documents and proceeds the evaluation stages for selection of qualified contractors to be called for tender
• Collaborates with clients in selection of the contractors
• Prepares the agreement documents for the selected contractors
2. Planning, Implementation Procedures and Progress Control
• Review and comment on general timetable prepared by the consultant in the detail design and implementation stages
• Review and comment on the technology and implementation procedures recommended in the detail design
• Pursue the project control and planning system, established by contractors and equipment suppliers and supervise its implementation
• Review and approve the detailed timetable including manpower, machinery and materials
• Prepare the monthly progress report, compare the actual progress with the recommended timetable, analyze the delays, if any and submit the appropriate solutions
3. Techno-Engineering Services
• Revise the design and shop drawings during implementation, if required
• Prepare forms, guidelines and documents for different stages of quality control, work inspection, tests, work completion and required work orders
• Prepare the detailed list of required tests
• Maintain the technical documents and quality control records
• Prepare lists of required resources for project implementation including manpower, materials, machineries and tools
• Revise the drawings and technical specifications during construction stage, if required and prepare the complementary and detailed shop drawings
• Control and approve the shop and as-built drawings
4. Quality Control Services
• Inspect the performed activities and compare with drawings, technical specifications, standards and work orders continually
• Check if the actual implemented axes and levels agree with the drawings
• Supervise storage and maintenance of materials and equipment on site
• Require the needed tests to be performed and supervise the performance
• Give notice the possible deficiencies, shortcomings and faults
5. Estimation, Quantity Control, Payments and Legal Issues of Contracts, Work Delivery
• Review and update the estimations and prepare the new bill of quantities during construction phase
• Measure the accomplished tasks and materials on site, control and approval of temporary and final statements
• Check the contractors delays according to the contract
• Review the legal issues of the contract, comment on contractors claims, and cooperate with the client in settlement of any disputes
• Review and comment on installments, new prices, redemption of guarantees, etc.
• Temporary and final delivery of services



Major Completed&Ongoing Projects

 Major Completed Projects of Supervision Division

Water Engineering, Dam, River Engineering

No

Project Title

Client

Location/ Province

Completion Date

1

Sarghanat Diversion Dam- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

1985

2

Churum Diversion Dam- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

1992

3

Rouzbehan Diversion Dam- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Fars

1995

4

Rais Ali Delvari Storage Dam Access Road- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

1999

5

Rais Ali Delvari Storage Dam Diversion Tunnel- Construction Supervision

Fars, Bushehr, Kohkilouyeh Boirahmad Regional Water Corporation

Bushehr

1998

6

Jegin Dam Water Conveyance Canal and Diversion Installations- Construction Supervision

Hormozgan Regional Water Corporation

Hormozgan

2007

7

Aras River Training in Maghsoudlou Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2000

8

Aras River Training in Tazehkand Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

9

Aras River Training in Davoodan Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

10

Aras River Training in Ozontappeh- Ghoorchai Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

11

Aras River Training in Qareh Daghlou Reach- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2002

12

Alesh-rud Riverbank Stabilization- Construction Supervision

Central Bank of Iran

Mazandaran

2002

 

 

Major Completed Projects of Supervision Division

Water Pump Stations

No

Project Title

Client

Location/ Province

Completion Date

1

Moghan Plain Pumping Plant No 8 (to supply water for 3500 ha of Bilehsavar lands)- Construction Supervision

Ardebil Regional Water Corporation

Ardebil

2001

2

Moghan Plain Pumping Plant No 4 (to supply water for 2500 ha of lands)- Construction Supervision

Pars Agro-Industry & Animal Husbandry Company

Ardebil

2001

3

Legzi Pumping Plant and Water Transmission Pipeline- Construction Supervision

Jihad Agriculture Organization of Kurdistan Province

Kurdistan

2003

4

Alghana Pumping Plants and Water Transmission Line- Construction Supervision

East Azarbaijan Regional Water Corporation

Ardebil

2005

5

Yengikand Pumping Plant- Construction Supervision

Zanjan Regional Water Corporation

Zanjan

2003

6

Moghan Plain Pumping Plant No 5 (with 2.2m3/s discharge capacity)- Construction Supervision

Pars Agro-Industry & Animal Husbandry Company

Ardebil

2002

7

Shahid Maleki (Bayouz) Pumping Plant (1.2m3/s discharge capacity) and Water Transmission Pipeline (2.2km long)- Construction Supervision

Iran Fishery Company

Khuzistan

1996

8

Pars I Pumping Plant of Moghan Irrigation Network - Construction Supervision

Pars Agro-Industry & Animal Husbandry Company

Ardebil

2002

9

Khuzistan Sugarcane Development Project, Amir Kabir Pumping Plant (with 36m3/s discharge capacity)- Construction Supervision

Sugarcane Development & Byproducts Company

Khuzistan

1996

10

Khuzistan Sugarcane Development Project, Mirza Kuchak Khan Pumping Plant (with 36m3/s discharge capacity)- Construction Supervision

Sugarcane Development & Byproducts Company

Khuzistan

1997

11

Khuzistan Sugarcane Development Project, Amir Kabir and Mirza Kuchak Khan Secondary Pumping Plants (60 Units)- Construction Supervision

Sugarcane Development & Byproducts Company

Khuzistan

1997

12

Sarab Changaie Pumping Plant- Construction Supervision

Ministry of Jihad Agriculture,

Lorestan Industrial Meet Complex

Lorestan

1986

 

 

Major Completed Projects of Supervision Division

Irrigation and Drainage

No

Project Title

Client

Location/ Province

Completion Date

1

Complementary and Improvement Works of Moghan Plain Main Irrigation and Drainage Network, Lots 1 and 2- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1990

2

Complementary and Improvement Works of Moghan Plain Border Drainage and Related Drainage Systems- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1995

3

Moghan Plain Main Canal's Watering Place- Construction Supervision (40 Units)

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1995

4

Moghan Plain Main, D3L & D1L Canal Lining- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1999

5

Complementary and Improvement Works of Moghan Plain Irrigation and Drainage Network, Lot 4- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1994

6

Moghan Plain D10L Canal Dredging and Lining- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1995

7

Moghan Plain Main Canal Lining Pilot Plan, Using Incomat Double-casing Polyamide Synthetics (840m long)-Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1999

8

Complementary and Improvement Works of Moghan Plain Irrigation and Drainage Network, Lot 6- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1998

9

Complementary and Improvement Works of Moghan Plain Irrigation and Drainage Network, Lot 7- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

1999

10

 

Complementary and Improvement Works of Moghan Plain Irrigation and Drainage Network, Lot 5B (1848 ha)- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation

Ardebil

2003

11

Complementary Works of Moghan Plain Irrigation and Drainage Network, Lots 6 & 7- Construction Supervision

East Azarbaijan and Ardebil Regional Water Corporation